Mission Critical - Infinite Built
806
wp-singular,page-template,page-template-full_width,page-template-full_width-php,page,page-id-806,wp-theme-bridge,bridge-core-3.3.4.7,qode-optimizer-1.2.2,qode-page-transition-enabled,ajax_fade,page_not_loaded,,no_animation_on_touch,qode-title-hidden,qode-theme-ver-30.8.8.7,qode-theme-bridge,qode_header_in_grid,wpb-js-composer js-comp-ver-8.7.2,vc_responsive
Mission Critical

Data Center Commissioning
Has No Margin for Error

When uptime is the deliverable, there is no room for version mismatches, scattered documentation, or the wrong stakeholder seeing the wrong report. Infinite Built Mission Critical gives data center teams one platform to manage commissioning from groundbreaking to handover.

The Industry Challenge

Complexity is Built In

Data center commissioning is not just another construction milestone. It is a convergence of electrical systems, mechanical infrastructure, BMS, and integrated testing that must all document cleanly, connect across platforms, and close out on time, with zero tolerance for gaps at turnover.

Your team is coordinating across owners, general contractors, commissioning managers, and trade contractors, often all using different tools. The result: manual re-entry, version mismatches, and documentation risk at the moment it matters most.

Disconnected tools
across the project

Owners, GCs, and commissioning teams each working in separate systems with no reliable bridge between them.

Compressed timelines due to
schedule slip

A single delayed test checkpoint cascades across the entire sequence, leaving commissioning teams scrambling to close out before the energization window.

Reporting gaps leave stakeholders
in the dark

Owners and executives relying on emailed spreadsheets and stale PDFs, with no reliable view into what's been tested, what's failed, and what's still open.

CxAlloy + Built Insights

One Solution.

The Complete Quality & Commissioning Solution

Two platforms. One solution. Integrated with your stack.

Peer platforms. Each viable on its own. Best in concert.

The De Facto Standard in Quality & Commissioning

The De Facto Standard.
One Platform, Every Stakeholder.

Everyone Gets What They Need

Data center projects involve more stakeholders than almost any other
asset class, and each one needs different information. Infinite Built Mission Critical serves all of them from a single source of truth.

Commissioning
Managers

Structured checklists, test records, and deficiency tracking built for the complexity of data center systems. Everything in one place, nothing lost between field and office.

Project
Owners

Real-time visibility into milestone progress and system readiness across every data hall, without waiting for status meetings.

General
Contractors

Issue sync with Procore and ACC keeps commissioning activity connected to the broader project schedule and reduces rework from disconnected platforms.

Portfolio
Teams

Analytics and reporting across multiple sites and projects. Understand where every asset stands and spot trends before they become problems.

Built to Get Data Center
Commissioning Done

Built to Get Data Center Commissioning Done

The Built Insights Full Suite connects your commissioning data to live dashboards that give owners and project leads a real-time view of progress across every asset and system. Tag equipment, track completion status, and surface the issues that matter, without chasing down status updates

Keep Your Schedule, Even When Complexity Grows

Track commissioning milestones against your project schedule and see exactly where you stand at every phase. CxAlloy's milestone and schedule tracking keeps your team aligned from pre-commissioning through integrated systems testing, so nothing slips through when the clock is ticking.

Turnover Packages Built Around Your Project

Every data center has its own systems, standards, and stakeholder requirements at closeout. CxAlloy lets you build custom turnover packages that organize your test records, checklists, and documentation exactly the way your project demands, so handover is clean, complete, and defensible.

Integrated With the Tools Your Team Already Uses

CxAlloy Mission Critical syncs issues directly with Procore and Autodesk Construction Cloud (ACC), so your commissioning data stays connected to the broader project without manual re-entry or version gaps. Enhanced integration with assets, checklists, and test records means your field team and your project management platform are always in sync.

Built-In Security

Your Data, Protected

Mission critical facilities operate under strict requirements around who accesses what and when. Both platforms include the access controls, authentication, and data isolation options your procurement and security teams will ask for. CxAlloy is ISO 27001:2022 certified and SOC 2 Type 2 attested. Built Insights certifications are in progress. Your commissioning records are protected by the same rigor you apply to the systems they document.

You’re Not on Your Own

Every enterprise customer gets a dedicated Customer Success Manager. Free online training, on-demand videos, live office hours, and a technical support team that knows commissioning. Not just software.

We’re Here for You

Contact Support